[06.) BLOG POSTS: PARAMETRIC FURNITURE/STRUCTURE COLLAB: FULL SCALE PROTOTYPE] WEEK 4 CONTD.

 Week 4 Continued

In class, we worked on finally cutting out all the pieces for both the shelves and bench as well as sanding them all and assembling them. I mainly helped out with the sanding and fitting of the bench and a little bit of the assembly for the bookshelf. I also did a lot of documentation for everyone in the group, so here are all the images I took while we worked on our project.

Some sanded pieces for the bench and shelves:


The glueing stage of the bench:


The assembly of the shelf:



The final assembly and glueing of the bench:


I'm glad our group at the very least managed to fully complete our bench mainly because I was in the small sub-group with both Nadia and Erica for the design of the bench so being able to see that piece fully completed was the most satisfying for me for the end of this project.


Comments

Popular posts from this blog

Papercraft Final

[04.) BLOG POST(S): PARAMETRIC FURNITURE/STRUCTURE SCALE MODEL] Part 1

Reversed Engineered Object: Progress II